Retrieving RFP details
Release
Close
City of Palmdale
The work may consist of but is not limited to: provide a qualified construction manager responsible to oversee the required inspection, materials and geotechnical testing and perform construction management for the construction of the subject project. Responsibilities include but not limited to
Monroe County
Work includes highway rehabilitation project.
City of Tulsa
Rehabilitation of non-arterial street maintenance. Including 689 CY aggregate base Type A; 1,126 SY subgrade method B; 1,945 SY separator fabric; 3,894 SY fabric reinforcement, glass pave25; 436 ton superpave, Type S4(PG 64-22)(InSoluble); 218 ton superpave, Type S6 (PG 64-22); 3,894 SY cold mill pavement; 21 CY class A concrete; 1,,631 LB reinforcing Steel; 400 LF 2'-2" combined curb and gutter(6" barrier); 126 SY of 4" concrete sidewalk; 429 SY of 6" concrete driveway; 336 LF RCP, 15" round,, complete in place; 1 ea of 6'-dia, manhole, complete in place; 117 LF of 6" DIP, CL 54 polyethylene wrapped, (RFJ); 773 LF of 6" DIP, CL 54 polyethylene wrapped; 117 LF of 6" PVC, AWWA C900, Class 200, DR-14, (RJ); 773 LF of 6" PVC, AWWA C900, Class 200, DR-14; 890 of 8" HDPE, AWWA C906, PE4710, DR-11, (DIPS). See attached file.
City of Lubbock
Road rehabilitation.
Release
Oct 09, 2025
Close
Nov 10, 2025