Logo

starbridge

Book a Demo
RFPs/Arlington Avenue 48" Sewer Repair *RE-BID*

Arlington Avenue 48" Sewer Repair *RE-BID*

City of Toledo

Summary

Project consists of replacement of a section of sanitary sewer, work include of repair and lining of 48" sewer in diameter with inverts approx 45 ft below existing grade. The sewer is planned to be installed using open-cut methods within a 25-foot diameter repair shaft.

Files

No files

Details

Release

Feb 07, 2025

Close

Apr 29, 2025

Contacts

Source