Summary
Work contemplated to be performed under this contract is as follows: Approx. 9 LF of 30" CMP culvert pipe removal, Approx. 13 LF of 30" PVC storm sewer pipe installation, Approx. 40 LF of 26" HDPE storm sewer pipe installation, Connection for dissimilar culvert pipe installation, Approx. 20 TN of riprap installation, Splash pad consisting of 12" streambed cobbles, outfall ballast, and gravel backfill for pipe zone bedding installation, Approx. 105 TN of crushed surfacing installation, Tree protection measure installation., Temporary traffic control during construction, Landscape plantings (trees and shrubs), Clearing and grubbing, tree removal, removal of structures and obstructions, stormwater bypassing, and water pollution/erosion control, Property restoration including removal and salvage of landscape features on private property.