Requesting an Arc Flash Study for employee Safety and correct PPE (Personal Protective Equipment). Contractor will provide an Arc Flash Hazard Analysis study in accordance with NFPA 70E Standards for electrical safety in the work place and IEEE Standard 1584-Electrical guide to performing Arc Flash Hazard Calculations. Contractor will collect electrical system information, model the electrical system using engineering software, analyze the electrical hazards, provide a written report with mitigation recommendations, and install Arc Flash warning labels. The assessment will begin at the utility service point and will include all significant three phase loads and power distribution equipment including switchgear, switchboards, panels, disconnects, transfer switches, starters, busways and motor control centers.