Village of Hanover Park
Installing approx. 160 lf of 6"; 7,110 lf of 8"; 30 lf of 10", 580 lf of 12" water main, and 120 lf of 10" water main lining, including new hydrants, valves, and other miscellaneous items of work. The scope also includes full resurfacing of the roadways within the project area. The contract will include all work necessary to install the water main, install water service lines via directional drilling or open cut methods, reconnect existing water service lines, restore and resurface the roadway, and perform all restoration to return the area to its original condition.
Release
Mar 18, 2025
Close
Apr 29, 2025