Retrieving RFP details
Release
Close
City of American Canyon
Work consist of exploratory excavations, earthwork & grading, remove existing crash cushions, remove concrete k-rail barriers, remove flashing beacon and foundation, install flashing beacon with new foundation, reconnect electrical for flashing beacon, 330 SF of concrete pad at new k-rail, 20 SF of concrete piers for slab, rebar connection to culvert, 8 EA of install new k-rail, 128 LF of metal beam guardrail, 30 EA of guardrail posts, 2 EA of guardrail system end treatment, 2 EA of connect guardrail system to concrete barriers, 14 EA of reflective flexible guideposts, 5 EA of rumble strips, 300 LF of 22b striping, 600 LF of 27b striping.
American Canyon Road East Guardrail (RFP)
zip
City of Boulder
Installation of traffic signal equipment.
New Mexico General Services Department
Alluvial drilling, rotary drilling, grout injection pipe, backfill and surface restoration, hand seeding and mulching, road repairs.
Town of Washington
Remove existing 15” culvert and install a new 18”; culvert (provided by the Town); Widen the roadway to a total width of 22 FL; Excavate and shape ditches 140 feet upstream and downstream from the culvert location; Stone-line both the inlet and outlet of the culvert; Adjust the culvert grade to bring it closer to the road surface.
Release
Oct 09, 2025
Close
Nov 12, 2025