Nassau County
This project consists of the construction of a new, 10' wide, paved multi-use trail the work to be performed is generally described as new trail construction and includes. Constructing a new asphalt paved trail constructing drainage structures and stormwater pipe. Constructing concrete sidewalk. Also includes 1,809 CY of regular excavation; 193 SY of milling existing asphalt; 366 TN of superpave asphalt concrete, traffic A; see outside link.
Release
Aug 23, 2024
Close
Sep 25, 2024