Campbell County
Concrete riser & valve replacement and annual inspec on & exercising of control valve.
1761158360_16655
Campbell County
Concrete riser and valve replacement. General guideline for the project: 1. Repair broken valve stem guides. 2. Use existing outlet valve to lower the lake down to approximate elevation 673 feet. A. It is anticipated that the lowering of the lake through the outlet valve will take approximately 3 to 4 weeks. Contractor to close valve on a weekly basis and let culvert pipe drain before reopening. B. Contractor to provide options for stopping water discharge in the event that the valve does not close or seal. 3. Install new blind flange with gasket to seal the existing inlet pipe (underwater work). Design and provide details and calculations for blind flange. 4. Open existing valve to drain the pipe and verify effectiveness of blind flange seal. 5. Remove existing valve stem and valve.
Jefferson County
Annual concrete installation, removal and replacement services.
City of Atlanta
Provide annual inspection, service and repair replacement of overhead crane, hoist and rail systems.
Release
Oct 22, 2025
Close
Nov 10, 2025