Logo

starbridge

Book a Demo
RFPs/AHU Replacement At the West Campus

AHU Replacement At the West Campus

Connecticut State Colleges and Universities

Summary

AHU replacement. Work includes mechanical; remove (5) existing packaged rooftop air conditioning units; limited ductwork demolition to accommodate removal and reinstallation of new equipment; install (5) new packaged rooftop air conditioning units; install new ductwork to accommodate new equipment; connect new RTU controllers into the existing campus controls network for monitoring and setpoint adjustments to be made by BMS. Electrical; disconnect electrical feed to (5) existing packaged rooftop air conditioning units; refeed (5) new rooftop air conditioning units from existing electrical panels plumbing; disconnect natural gas piping to (4) existing packaged rooftop air conditioning units; refeed (4) new rooftop air conditioning units with new gas piping structural; install supplemental steel on existing dunnage for (1) new packaged rooftop air conditioning unit to accommodate larger unit size.

Files

bulk

zip

Details

Release

Aug 23, 2024

Close

Sep 19, 2024

Contacts

Source

Get a Free RFP Download