Franklin Township Community School Corporation
Provide replacement of three (3) existing 1,500 MBH atmospheric boilers with three (3) new 1,500 MBH high efficiency boilers. Replacement of the existing heating water pumps and associated accessories. System is changing from variable flow primary pumping system to a primary/ secondary pumping system.
bid ad
Release
Jan 10, 2025
Close
Jan 28, 2025