Charleston Water System
The work to be performed consists of the replacement of all sprockets, chains, flights, and shafts inside of FST basins for the purpose of rehabbing the basins with all new mechanical parts.
Northeast Ohio Regional Sewer District
Westerly primary settling tank fiberglass repairs 1 ls; work generally consists of removal of damaged fiberglass components within the primary settling tank no. 1. Preparation of surfaces, and fiberglass repairs to existing effluent launders and troughs. Provide all necessary confined space entry, scaffolding, and general mobilization needs to entire primary settling tank and complete work.
Camden County Municipal Utilities Authority
Clearing site; Rehabilitation of existing four (4) tanks and walkways in the PST and SST, the Dosing Tank, and the Drainage Sump wet well including concrete restoration, crack repairs, interior concrete coating, exterior painting, and walkways top sealer; Removal of existing guardrails for the PST and SST; Removal and replacement of equipment for the PST and SST including the chain and flight systems, scum troughs, baffles, weirs, sludge collection piping and valving, and miscellaneous valving; Installation of aluminum guard rails and handrails for the PST and SST and connection of PST handrails to the existing PST staircase handrails; Installation of new lighting around the PST and SST and PST pipe shed; Demolition and installation of new pre-cast concrete top slab for wet well and valve vault with metal hatches; Demolition and installation of new equipment for the Drainage Sump including two (2) submersible pumps, electric davit crane, discharge piping and valving, pump controls and SCADA integration; Site cleaning and restoration; Contract closeout documentation.
Mahoning County
Furnishing the necessary labor and materials for the rehabilitation, construction and subsequent maintenance period of one (1) year to wit: Boardman Wastewater Treatment Plant - Digester, Aeration, Settling Tank - Improvement #536 - Phase II.