Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Webster County
Work includes provision and installation of two new pumps, pump control panel, grinder, and grinder control panel. Provide and install sewer pumps and grinder according to the following specifications: two (2) pumps rated at 180 GPM at 125 or above; new stainless steel panel with at 548 soft starters, 4" bases, (DI) piping, stainless steel guide rail, stainless steel bolts and chain; See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Green River
Major Items of work include: 1. Sewer Lift Station Rehabilitation - 4 EA; 2. Pumping Equipment Rehabilitation - 4 EA; 3. Structural Concrete - 7 CY.; 4. Generators - 2 EA.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
City of Green River
Close: Dec 18, 2025
Major Items of work include: 1. Sewer Lift Station Rehabilitation - 4 EA; 2. Pumping Equipment Rehabilitation - 4 EA; 3. Structural Concrete - 7 CY.; 4. Generators - 2 EA.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Forney
Work consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
City of Forney
Close: Dec 18, 2025
Work consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.
AvailableUniversity Of Arkansas
Work includes replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
Posted Date
Nov 9, 2025
Due Date
Dec 9, 2025
Release: Nov 9, 2025
University Of Arkansas
Close: Dec 9, 2025
Work includes replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
AvailableGeorgia Ports Authority, Engineering and Maintenance Dept.
Perform lift station maintenance.
Posted Date
Nov 21, 2025
Due Date
Dec 10, 2025
Release: Nov 21, 2025
Georgia Ports Authority, Engineering and Maintenance Dept.
Close: Dec 10, 2025
Perform lift station maintenance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →