Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Webster County
Work includes provision and installation of two new pumps, pump control panel, grinder, and grinder control panel. Provide and install sewer pumps and grinder according to the following specifications: two (2) pumps rated at 180 GPM at 125 or above; new stainless steel panel with at 548 soft starters, 4" bases, (DI) piping, stainless steel guide rail, stainless steel bolts and chain; See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Camrosa Water District
Work includes approx. 1 LS of temporary bypassing; 1 LS of sheeting, shoring, and excavation safety measures; 1 LS of sanitary sewer force main tie-in to existing line; 1 LS of wet well modifications, access hatch, and lid; 1 LS of site lighting; 1 LS of pumps, motors, and VFDs; 1 LS of lift station piping and appurtenances; 1 LS of electrical, controls, and instrumentation; 1 LS of lift station site improvements; see outside link for more details.
Posted Date
Oct 23, 2025
Due Date
Dec 4, 2025
Release: Oct 23, 2025
Camrosa Water District
Close: Dec 4, 2025
Work includes approx. 1 LS of temporary bypassing; 1 LS of sheeting, shoring, and excavation safety measures; 1 LS of sanitary sewer force main tie-in to existing line; 1 LS of wet well modifications, access hatch, and lid; 1 LS of site lighting; 1 LS of pumps, motors, and VFDs; 1 LS of lift station piping and appurtenances; 1 LS of electrical, controls, and instrumentation; 1 LS of lift station site improvements; see outside link for more details.
AvailableCity of Huntington Beach
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
Posted Date
Oct 15, 2025
Due Date
Nov 20, 2025
Release: Oct 15, 2025
City of Huntington Beach
Close: Nov 20, 2025
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
AvailableCity of Huntington Beach
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
City of Huntington Beach
Close: Nov 20, 2025
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.
AvailableUniversity Of Arkansas
Work includes replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
Posted Date
Nov 9, 2025
Due Date
Dec 9, 2025
Release: Nov 9, 2025
University Of Arkansas
Close: Dec 9, 2025
Work includes replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis