Retrieving RFP details
Release
Close
Mesa County
Work consists of drainage improvements project, work includes, 32 LF of removal of pipe; 15 SY of removal of asphalt mat; 150 CY of unclassified excavation; 15 SY of asphalt patching; 214 LF of 30" rcp storm pipe; 100 LF of 18" rcp storm pipe; 29 LF of 12" hdpe storm pipe; 29 SY of gravel. See outside link.
City of Falls Church
Provide stormwater drainage improvements project.
City of Brownsville
Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control includes 1,763 LF 24" class III RCP, 2 EA 4 foot diameter precast concrete manhole, 20 LF 6" DR-25 PVC fire line (incl. all reqd. fittings, restraints, and adapters), 3,150 LF 12" DR-25 PVC waterline (incl. all reqd. fittings, restraints, and adapters), 1,045 LF 12' SDR-35 PVC sanitary sewer line 0-8 foot depht, 20 LF 20" open cut steel casing.
Borough of Highlands
Installing an 8" PVC pipe across Borough property from an existing open-ended pipe adjacent to 37 Twinlights Terrace, routing it overland, and then beneath the proposed retaining wall along South Peak Street, ultimately teeing into the existing drainage system. The intent is to improve stormwater management and connectivity with current infrastructure.
Release
Oct 29, 2025
Close
Nov 20, 2025