Retrieving RFP details
Release
Close
North Dakota Department of Transportation
Work includes 781 TN aggregate base course cl 5; 35529 gal tack coat; 35529 gal fog seal; 21441 TN milling pavement surface; 80157 TN rap - superpave FAA 45; 552 EA cored sample; 3769 TN PG 58H-34 asphalt cement; 1 LS mobilization; 900 MHR flagging; 2839 unit traffic control signs; 4 EA portable rumble strips; see attached files.
24041, NH-2-052(054)244 & NH-2-281(050)006 - Mill and Overlay - (RFP)
zip
North Dakota Department of Transportation
Work includes 6858 SY removal of bituminous surfacing; 30609 ton removal of bituminous surfacing; 190 LF removal of culverts-all types & sizes; 11610 CY common excavation-type A; 4191 CY topsoil; 1103 CY topsoil-imported; 3605 CY common excavation-subcut; 1052 CY borrow-excavation; see attached files.
North Dakota Department of Transportation
Work includes 19,050 tn of remove aggregate base and surfacing; 35 SY removal of concrete pavement; 42 LF removal of curb; 26 EA removal of end section-all types & sizes; 278 LF removal of culverts-all types & sizes; 21570 CY common excavation-type A; 6574 CY topsoil; 16407 CY common excavation-waste; 828 CY topsoil-imported; see attached file.
North Dakota Department of Transportation
15.638 Mile shoulder preparation; 64 Ton ag surface course, cl 13; 856 SY milling pavement surface; 2,028 unit traffic control signs; 449 LF of 12" epoxy pavement marking line; 10,322 LF of 6" short term line, ty NR. See attached file.
Release
Oct 20, 2025
Close
Nov 14, 2025