Retrieving RFP details
Release
Close
Michigan Department of Technology, Management and Budget
Provide 1.17 mi of concrete sidewalk and ramps, storm sewer, ditch grading, hot mix asphalt hand patching, and drainage structure adjustments that also includes 5 EA tree, rem, 19 inch to 36 inch; 20 EA culv, rem, less than 24 inch; 450 LF curb and gutter, rem; 60 LF fence, rem; 60 CY masonry and conc structure, rem; 55 SY sidewalk, rem; 190 SY pavt, rem, modified; 5 CY excavation, earth; 5,870 LF sidewalk, grading; 200 LF erosion control, silt fence; 1,690 SY aggregate base, 6 inch. See attached file.
219328A - Concrete Sidewalk and Ramps, Storm Sewer
zip
Michigan Department of Technology, Management and Budget
1.30 mi of concrete roadway reconstruction, concrete sidewalk and ramps, storm sewer and pavement markings.
Michigan Department of Technology, Management and Budget
Work includes 0. 30 mi of concrete sidewalk and ramps, concrete curb and gutter, pedestrian refuge, hot mix asphalt hand patching, and permanent pavement markings that also includes 9 EA culv, rem, less than 24 inch; 610 LF curb and gutter, rem; 282 SY pavt, rem; 53 SY sidewalk, rem; 1,150 CY excavation, earth; 500 LF erosion control, silt fence; 250 LF sewer, cl a, perforated slcpp w\sock, 12 inch, tr det b, modifed. See attached file.
Michigan Department of Technology, Management and Budget
0.72 mi of install concrete sidewalk and ramps, signing and pavement markings.
Release
Oct 10, 2025
Close
Nov 07, 2025