Summary
Work includes 90 lf 24-inch (24") pipe removal & replacement (using 24-inch (24") high-density polyethylene (hdpe) pipe, including adapters to connect to existing pipe) by excavation, all depths, including excavation; trench safety; groundwater control; sewer flow control (including by-pass pumping, if required); installation; bedding; removal of old pipe; any necessary pipe fittings; testing; backfill and compaction testing; pre- and post-construction cleaning and televising; removal and replacement of sprinkler systems and other above ground obstructions per attachment a of the contract; and site restoration (includes removal and replacement of fencing, sod, driveways, sidewalk, signs, wooden bollards, curb stops, street panel, etc. As needed). See attached file.