Retrieving RFP details
Release
Close
Town of Garner
Sidewalk cutting project includes concrete cutting, trip hazard removal, maintenance, repair, and all other associated services. Repair all sidewalk trip hazards from 1/4" to 2.5" in height. Hazards will be completely removed using horizontal cutting from one end of the raised sidewalk joint to the other, where applicable (edge-to-edge), including flush to an abutting obstacle such as a retaining wall leaving a zero point of differential between and without causing damage to adjacent sidewalks panels. See outside link or attached file.
FINAL Request for Bids 2025 Sidewalk Cutting Project
District of Columbia Department of Transportation
Project consists of horizontal sidewalk cutting of trip hazards on sidewalk. See outside link.
Glynn County
Work includes install approx. 750 LF of 6'0" concrete sidewalk to include ADA ramps, crosswalk striping, curb and gutter. The work will include but is not limited to single lane closure, traffic control, grading, clearing, demo, saw cutting of existing concrete and asphalt, crosswalk installation with signage, installation and maintenance of erosion and sediment control best management practices, sidewalk construction, backfill, dressing and grassing. See attached files.
City of Pasadena
Sidewalk Improvements.
City of Happy Valley
Project includes demolition and replacement of defective sidewalk panels, and construction of new sidewalk planters on multiple streets.
Release
Oct 06, 2025
Close
Oct 31, 2025