Retrieving RFP details
Release
Close
City of Floodwood
2650 CY - common excavation; 7 ea - hydrant and gate valve; 185 LF - 6" watermain; 1766 LF - 8" watermain; 1525 LF - 8" watermain hdd; 420 LF - 1" water service pipe; 12 ea - connect to existing watermain; 930 tons - bituminous pavement.
Pinedale Water Sewer And Fire Protection Authority
The project consists of making improvements to the water distribution infrastructure to include construction of an elevated water storage tank, booster pumping station, and a new purchase meter connection
Village of Rewey
The Project consists of sanitary sewer chimney rehabilitation, storm water ditch excavation, and concrete stoop pouring at the Village’s Wastewater Treatment Facility. Additional work includes water main replacement at the Village’s Water Tower and Well House #2.
Town of Albion
The work for this project includes electrical, mechanical piping, fencing, chlorination, grading, site work, 6" and 8" water mains, a fire hydrant, building improvements, a packaged booster pump system, an emergency backup generator, retaining walls, fencing, water meter replacement (including new water meters, meter boxes, meter setters, and an automated meter reading system), and surface restoration; along with other miscellaneous work to complete the project. The work may include additive alternates for replacement of additional water meter boxes and roadway improvements to the owner's reservoir tank (including grading and earthwork, geotextile, and gravel surfacing).
Release
Oct 15, 2025
Close
Nov 07, 2025