City of Statesville
This project consists of grading, forming, and pouring sidewalk along streets. 4" thick concrete sidewalk, - 2,086 SY more or less. 6" thick concrete sidewalk for driveway apron and sidewalk in driveway, 668 SY, more or less. ADA Ramps, 17 ADA ramps, more or less. 174 LF, 2’-6” Curb and Gutter.
attachments-original-1744718050-Formal_ITB-_Statesville_Sidewalk_Construction_Project_2025_(1)
Release
Apr 15, 2025
Close
Jun 02, 2025