Work generally includes milling and paving of several streets. Work also includes subbase installation (as directed), grade adjustment of existing structures, maintenance and protection of traffic and all else necessary to complete the project as shown on the contract drawings and/or as specified. 68 CY class 1 excavation to 12.5" depth and removal of existing subbase and subgrade, as required to install new asphalt and subbase; 195 SY subbase installation. Includes 6" depth of penndot no. 2a coarse aggregate (as directed); 8,771 SY milling of asphalt pavement surfaces 1-1/2" depth (milled material to be retained by contractor). See outside link.
Release
Jun 04, 2025
Close
Jun 16, 2025