RFPs/2025 Prequalification of Electrical Utility Contractors
2025 Prequalification of Electrical Utility Contractors
City of Richland
Summary
Work may include electrical distribution (2,400V-15,000V), electrical transmission (52,000V-230,000V), electrical substation (2,400V-230,000V), and secondary electrical systems (0V-600V).