Logo

starbridge

Book a Demo
RFPs/2025 Directional Boring Contract

2025 Directional Boring Contract

City of River Falls

Summary

2025 Directional Boring Contract. The work specified in this contract consists of furnishing and installing HDPE conduit using the horizontal directional drilling (HDD) method of installation, also commonly referred to as directional boring or guided horizontal boring. This work shall include all necessary services, equipment, and labor for the complete and proper installation, testing, surface restoration, replacement of any damaged utilities, environmental protection and traffic control. The work to be performed under this contract includes 16,000 LF of directional drilling HDPE conduit in various sizes ranging from 1-1/4 to six inches in diameter. Work also includes, but is not limited to, pulling owner supplied electric cable into new conduit.

Files

No files

Details

Release

Mar 19, 2025

Close

Apr 14, 2025

Contacts

Source

Get a Free RFP Download