Retrieving RFP details
Release
Close
City of Grain Valley
Trail construction.
2025 Buckner Tarsney Trail Construction SW Rock Creek Lane To Sw Nelson Drive
zip
City of Grimes
The SW 19th Street SRF Sponsored Pond project includes construction of a pond located south of SW 19th Street approx. 2,000 feet west of James Street. The improvements include the construction of approximately 225,000 CY of earthwork, 340 LF of RCP storm sewer between 12-inch diameter and 30-inch diameter, 4 storm sewer structures, 7 concrete aprons, subdrain, pavement patching, traffic control, erosion control and miscellaneous associated work necessary to complete the project.
San Antonio River Authority
This project involves the construction of a 1.6-mile, 12' wide concrete trail that will connect to the existing Culebra Creek Trails within the Howard W. Peak Greenway Trails System. The project will include one street connection at Culebra Road and one neighborhood connection to the Nueces Canyon neighborhood, enhancing trail accessibility and connectivity within the area. See attached file.
City of Bentonville
Work consists of Stormwater improvements that will divert the drainage from a culvert under SW 2nd street to a proposed storm sewer system which will run parallel to SW 2nd (HWY72). The work is expected to include but not be limited to excavation, sodding, erosion control, tree protection, temporary traffic control, and mobilization required.
Release
Sep 25, 2025
Close
Oct 29, 2025