Retrieving RFP details
Release
Close
City of Bloomington
The project shall include, roofing system evaluation and alternative solutions for water infiltration issues, roof repairs and coatings, drainage system upgrades, and interior finishes and conditions.
Buffalo Public Schools
Roof reconstruction, gymnasium roof thru-wall flashing and related work.
Chautauqua County Unified School District 286
Project consists provide all materials, and equipment necessary for the construction of a new concrete sidewalk and drainage. The project scope includes, but is not limited to, the following tasks: concrete installation - install a 153'5" x 6' concrete sidewalk along the northwest side of the gym; install a 9'8" x 6' concrete sidewalk section at the northeast corner, connecting to the longer section; all concrete work must comply with ada slope and access standards; excavation and subgrade preparation; excavate existing material and prepare a compacted base suitable for concrete placement; ensure proper slope away from the building for surface water drainage. Waterproofing and sealing.
Alba-Golden Independent School District
Provide replace the metal roof system on the elementary school gymnasium.
Release
Oct 06, 2025
Close
Nov 10, 2025