Removal and replacement of existing 6" or 8" sewer mains with 8" sewer mains using trenchless and open cut pipe replacement construction methods, sewer lateral reconnections & replacement, sewer manhole reconnections, cleanout and/or backflow prevention devices, sewer and storm drain manhole installations and rehabilitation, surface restoration, pavement restoration, potholing, asphalt concrete removal, asphalt concrete installation, asphalt concrete base repair, slurry seals, ADA ramp construction, PCC curb & gutter removal and replacement, PCC sidewalk removal and replacement. See outside link.