Retrieving RFP details
Release
Close
Clarkston Community Schools
Site work, roofing, architectural, and electrical trades.
Bennington High School
Project consists of high school #2 - bid package #6.
City of Covington
Construct a public works building with 6,000 SF of floor area, vehicle wash bay, and covered storage area. Site work includes clearing and grading, stormwater, water, sewer, electrical utilities, asphalt paving, fencing, and landscaping. Construct frontage improvements along Southeast 251st including cement concrete curbs and gutters, cement concrete sidewalks, landscaping, channelization, and traffic control. Alternate 1 - 2 EA gate operator system, alternate 2 - 1 LS ultrablock bins, alternate - 1 LS generator and ATS, 250 kW.
Ucla School Of Law
This Bid Package consists of site prep and installation of new irrigation and landscaping at the exterior of the facility. Landscaping work includes the furnishing and installation of biofiltration irrigation drains, media, and planting. Irrigation work is performance based and includes a deferred design element for approval by the project team.
Release
Oct 23, 2025
Close
Nov 18, 2025