Logo

starbridge

Book a Demo
RFPs/2021 Water System Improvements (AFB)

2021 Water System Improvements (AFB)

Southeast Rankin Water Association

Summary

Work includes installation of approx 32,300 LF of new 4" and 6" PVC waterlines by open cut installation, approx 3,100 LF of 4" through 12" HDPE waterlines and casings by horizontal direction drill HDD, re-connections of existing water meters, installation of water-service lines and casings, driveway bores, gate valves, pressure-reducing valve assembly, fire hydrants, tie-ins to existing waterlines, abandonment of existing waterlines.

Files

8104-20240925125437 SWRWA

pdf

Details

Release

Oct 02, 2024

Close

Nov 01, 2024

Contacts

Source