Sampson County
Provide new water mains for surrounding areas in the vicinity of the existing GFL landfill. The total length for the project is 88,200 LF (17 miles) of 8, 6, and 4" water mains including all tees, valves, and other fittings. Installation will include PVC pipe by open cut, HDPE pipe by directional drill, DI pipe by directional bore, and steel and DI pipe by bore and jack under NCDOT roadways and will include all erosion control devices and asphalt repairs as required.
City of Knox
Project consist of jack and bore for sanitary sewer and water main extensions including site restoration.
Tahlequah Public Works Authority
Construction of 22,284 LF of 12" Water Line, Valves, Service Lines, Meter Settings, Hydrants, and 77 LF of 8" Water Line.
City of Cape Coral
Provide design-build services for water and sewer main extensions.