Douglas County
This project involves three primary elements: Stream rehabilitation, storm sewer outfall repair, and pond dredging. The stream rehabilitation includes raising the stream bed with bank grading and shaping as well as in-channel grade control and vegetative measures. The storm sewer outfall repair includes rebuilding of storm sewer pipe and stabilization of outfall areas. The pond dredging includes removal of accumulated sediment in an existing pond and hauling sediment offsite for disposal.
Release
Jun 11, 2025
Close
Jun 25, 2025