Pinellas County
Work inlcudes includes reconstruction of the roadway approaches, curb, gutter, sidewalk, and installation of 10" reclaimed water and 14" potable water lines under the canal via horizontal directional drill.
Release
Mar 28, 2025
Close
Apr 10, 2025