Virginia Dept. of Transportation, Central Region Operations Center
60 LF railing timber rail replacement (Type A); 90 LF railing timber rail replacement (Type B); 2,050 SF shotcrete Type A, SPR, struct. main; 175 SY H.E.S patching Type B; 5 SY H.E.S. Patching Type C; 30 deck slab closure; 184 LF expansion joint reconstruction HES; 15 LF back wall reconstruction HES; 205 LF clean and reseal expansion joint; 136 LF reconstr. expan. joint removal of armor & reconstruct joint opening; 310 LF adhesive based JT. sealer CL. 1, 2" const; 125 LF adhesive base JT. sealer CL. I, 3" const; 80 CF furnish asphalt plug joint; 48 LF place asphalt plug joint; 310 SY type A milling polymer overlay removal; 250 SY expoxy overlay maint.
20250610043239JUN-N02
Release
Jun 10, 2025
Close
Jul 23, 2025