Retrieving RFP details
Release
Close
Illinois Department of Transportation
Work includes 441 SY topsoil furnish and place, 4"; 66 ton polymerized hot-mix asphalt binder course, IL-4.75, N50; 420 SY portland cement concrete driveway pavement, 6"; 824 SF portland cement concrete sidewalk 5"; 16,133 SY hot-mix asphalt surface removal, 2 1/4"; 323 SY class D patches, type II, 8"; 484 SY class D patches, type III, 8"; 646 SY class D patches, type IV, 8"; 18,336' temporary pavement marking - line 4"- paint; 4' concrete foundation, type a 12" dia.; 10 EA. Sanitary manholes to be adjusted.
Town of Noma
Work include approx: 10,700LF Solid yellow traffic stripe (paint); 1,500Gal Tack Coat; 3,900SY asphalt pavement, 1.5" ave. depth. See outside link for more details.
City of Lake Alfred
Provide street resurfacing services. All potholes shall be patched before resurfacing. Intersections when needed will be milled for a smooth transition. Roadways without curbing will be edged and swept before resurfacing. Roadways with curbing will be cleaned and free of vegetation before resurfacing. Resurfacing will be done with a minimum of two inches of type sp 9.5 or better asphalt. Roads to be milled will be done at a minimum of one inch. New surfacing will be done to ensure a smooth transition around manholes in the paved area. Preform manhole ring and cover adjustments. All traffic control and detouring will be the responsibility of the contractor.
Village of Blanchardville
Work includes approx 1,680 LF 6" PVC sanitary service laterals; 1,454 LF 8" PVC SDR 35 sanitary sewer; 305 LF 12" PVC C900 water main; 935 LF 8" PVC C900 water main; 1,000 LF 1" cooper water service laterals; 147 LF 24" RCP class III storm sewer. See outside link.
Release
-
Close
Nov 07, 2025