Retrieving RFP details
Release
Close
Oklahoma Department of Transportation
Approx. 30,614 Ton Superpave, type S4; 234,288 SY cold milling pavement; 104,128 LF rumble strip-method HMA-con; 148 SD port. Changeable message sign; 105 CY type A-salvaged topsoil; 889 SY solid slab sodding; 686,764 SY cold milling pavement; 215,957 LF sawing pavement. Project length = 19.44 mi. See attached file.
Call Order_ 070
Oklahoma Department of Transportation
Approx. 600 CY Aggregate base type B; 530 Gal fog seal; 474,603 LF concrete joint sealing; 478,525 SY diamond grinding concrete pavement; 658 SD Port. changeable message sign; 224 SF sheet aluminum signs; 329,496 LF (SP) traffic stripe(plural-component)(6" wide), project length = 14. 604 miles. See attached file.
Wisconsin Department of Transportation
Removals, milling, grading, aggregate, concrete pavement, asphalt pavement, structure rehabilitation, curb and gutter, concrete sidewalk, beam guard, erosion control, traffic control, pavement marking, lighting, traffic signals, restoration. See attached file and outside link.
Wisconsin Department of Transportation
Removals, milling, grading, aggregate, concrete pavement, asphalt pavement, structure rehabilitation, curb and gutter, concrete sidewalk, beam guard, erosion control, traffic control, pavement marking, lighting, traffic signals, restoration. See attached file and outside link.
Release
-
Close
Dec 11, 2025