Retrieving RFP details
Release
Close
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, and traffic stripe. Includes 388 LF of removing guardrail; 13,703 gal. of tack coat; 130,503 SY of micro-milling existing pavement (approx. 1.10" thru 2.00" thick); see attached file.
NTC 11
07
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, and traffic stripe. Includes 12,012 gal. of tack coat; 120,112 SY of micro-milling existing pavement (approx. 1.10" thru 2.00" thick); 1 mile of scoring bituminous pavement surface; see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, and traffic stripe. Includes 11 EA of removing flexible delineator post with base; 14,652 gal. of tack coat; 137,693 SY of micro-milling existing pavement (approx. 0.00" thru 1.00" thick); see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, and traffic stripe. Includes 8 EA of removing guardrail end anchor (all type); 8,775 gal. Of tack coat; 87,746 SY of micro-milling existing pavement (approx. 0.00" thru 1.00" thick); see attached file.
Release
Oct 10, 2025
Close
Nov 07, 2025