Retrieving RFP details
Release
Close
Alabama Department of Transportation
Constructing the micro-milling, resurfacing (scrub seal), guardrail installation, and traffic stripe. Also includes 291 LF of removing guardrail;36,210 SY of bituminous treatment G (with polymer additive); 10,993 gal. of tack coat; 99,930 SY of micro-milling existing pavement (approx. 1. 10" thru 2.00" thick); see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing (scrub seal), bridge guardrail retrofit, guardrail installation, and traffic stripe. Includes 200 LF of removing guardrail; 8 EA of removing guardrail end anchor (type 2A); 1,804 TN of crushed aggregate, section 825, for miscellaneous use; see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, guardrail installation, and traffic stripe. Includes 813 LF of removing guardrail; 12,918 gal. of tack coat; 129,154 SY of micro-milling existing pavement (approx. 1.10" thru 2.00" thick); see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, and traffic stripe. Includes 8 EA of removing guardrail end anchor (all type); 8,775 gal. Of tack coat; 87,746 SY of micro-milling existing pavement (approx. 0.00" thru 1.00" thick); see attached file.
Release
Oct 10, 2025
Close
Nov 07, 2025