Alabama Department of Transportation
Constructing the micro-milling, resurfacing, and traffic stripe. Includes 6,797 gal. of tack coat; 67,968 SY of micro-milling existing pavement (approx. 1.10" thru 2. 00" thick); 5,608 TN of superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, ESAL range c/d; see attached file.
033, 20251107033, NH-0017(600) - Constructing the Micro-milling, Resurfacing, and Traffic Stripe
zip
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, and traffic stripe. Includes 6,840 gal. of tack coat; 68,393 SY of micro-milling existing pavement (approx. 0.00" thru 1.00" thick); 200 TN of aggregate surfacing (1" down, crusher run); see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, and traffic stripe. Includes 8 EA of removing guardrail end anchor (all type); 8,775 gal. Of tack coat; 87,746 SY of micro-milling existing pavement (approx. 0.00" thru 1.00" thick); see attached file.
Alabama Department of Transportation
Constructing the micro-milling, resurfacing, guardrail installation, and traffic stripe. Includes 813 LF of removing guardrail; 12,918 gal. of tack coat; 129,154 SY of micro-milling existing pavement (approx. 1.10" thru 2.00" thick); see attached file.