Retrieving RFP details
Release
Close
Alabama Department of Transportation
Work includes constructing the planing, resurfacing, bridge rail retrofit, guardrail installation and traffic stripe. Includes 16 SY of removing concrete flumes; 84 CY of unclassified excavation; 18 CY of cement mortar flowable backfill, mix 2; 1,589 TN of crushed aggregate, section 825, for miscellaneous use; 189 LF of 24" roadway pipe, jacked installation (smooth steel); 5,700 LF of combined duct and cable,2 #6 AWG/ 1 #6 AWG ground; see attached file.
NTC 11
07
Alabama Department of Transportation
Constructing the micro-milling, resurfacing (scrub seal), bridge guardrail retrofit, guardrail installation, and traffic stripe. Includes 200 LF of removing guardrail; 8 EA of removing guardrail end anchor (type 2A); 1,804 TN of crushed aggregate, section 825, for miscellaneous use; see attached file.
Alabama Department of Transportation
Constructing the planing, resurfacing, guardrail installation, and traffic stripe. Includes 13 EA of removing guardrail end anchor (all type); 7,747 gal. of tack coat; 77,465 Sy of planing existing pavement (approx 0.00" thru 1.0" thick); see attached file.
Alabama Department of Transportation
Constructing the micro-fine milling, resurfacing, guardrail installation, and traffic stripe. Includes 244 EA of removing raised pavement markers; 7 STA of machine grading shoulders; 500 TN of crushed aggregate, section 825, for miscellaneous use; see attached file.
Release
Oct 10, 2025
Close
Nov 07, 2025