Retrieving RFP details
Release
Close
Alabama Department of Transportation
Work includes constructing the roadway safety improvements (full bridge rail retrofit and guardrail installation). Includes 125 CY of unclassified excavation; 1,700 CY of borrow excavation (loose truckbed measurement); 150 TN of aggregate surfacing (1" down, crusher run); 370 LF of bridge rail retrofit, type SC(CB); see attached file.
015, 20251107015, HSIP-MR25(912) - Constructing the Roadway Safety Improvements
zip
Alabama Department of Transportation
Work includes constructing the traffic signal upgrades (traffic signal backplate installation). Also includes 485 EA of miscellaneous equipment, backplate for existing vehicular signal head, 3 section; 11 EA of miscellaneous equipment, backplate for existing vehicular signal head, 4 section; see attached file.
Alabama Department of Transportation
Work includes 96 SY of Removing Concrete Slope Paving; 54 LF of Removing Curb And Gutter; 1 EA of Removing Trees; 450 TN of Crushed Aggregate, Section 825, For Miscellaneous Use; see attached file
Alabama Department of Transportation
Work includes constructing the roadway safety improvements (slope flattening and guardrail installation). Also includes 1 LS of clearing and grubbing (approx 1 acre); 516 CY of unclassified excavation; 255 TN of loose riprap, class 2; 2,225 LF of steel beam guardrail, class A, type 2; see attached file.
Release
Oct 10, 2025
Close
Nov 07, 2025