Retrieving RFP details
Release
Close
Iowa Department of Transportation
0.17 Acre clearing and grubbing; 1,080 CY excavation, cl 10; 50 LF guardrail, formed steel beam; 126 Ton hot mix asphalt; 12.10 station pavement markings; 145.70 SY pavement scarification; 174.20 CY structural concrete; 620 CY topsoil, strip/salvage/spread. See attached file.
Notice To Bidders
Iowa Department of Transportation
The work consist of approx 311 CY embankment-in-place; 1,004 CY excavation class 10; 116 CY excavation class 20; 1,260 LF 10" steel pile; 151.80 CY structural concrete.
Iowa Department of Transportation
The work consist of approx 1,291.34 CY excavation class 13; 150 LF formed steel beam guardrail; 57,984.60 SY pavement scarification; 14.70 removal of pavement/drives/sidewalk; 900 TON crushed stone surface.
Iowa Department of Transportation
0.20 Acre clearing and grubbing; 36 LF culvert pipe; 470 CY excavation, cl 10; 0.80 Acre mulching; 0.40 Acre seeding and fertilizing; 142.90 CY structural concrete; 385 CY topsoil, strip/salvage/spread. See attached file.
Release
Oct 21, 2025
Close
Nov 18, 2025