Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Harris-Waller Counties Mud 4
Work includes 4,099 LF 8" c-900 awwa (dr18) class 235, waterline (including fittings, bedding, backfill and testing), complete in place; 319 LF 8" c-900 awwa (dr18) class 235, restrained joint waterline (including fittings, bedding, backfill and testing), complete in place; 46 LF 12" c-900 awwa (dr18) class 235, waterline (including fittings, bedding, backfill and testing), complete in place; 36 LF 16" steel casing with c-900 by certa-lok (or approved equal), ss casing spacers & end seals, tracer wire, 3m electronic caution tape; 14 EA 8" gate valve and box, bury as shown, (including lead); 1,459 LF 8" sanitary sewer pipe, 0-10 foot depth, (including air testing, mandrel testing, bedding and backfill), complete in place. See attached files.
Posted Date
-
Due Date
Mar 18, 2026
Harris-Waller Counties Mud 4
Close: Mar 18, 2026
Work includes 4,099 LF 8" c-900 awwa (dr18) class 235, waterline (including fittings, bedding, backfill and testing), complete in place; 319 LF 8" c-900 awwa (dr18) class 235, restrained joint waterline (including fittings, bedding, backfill and testing), complete in place; 46 LF 12" c-900 awwa (dr18) class 235, waterline (including fittings, bedding, backfill and testing), complete in place; 36 LF 16" steel casing with c-900 by certa-lok (or approved equal), ss casing spacers & end seals, tracer wire, 3m electronic caution tape; 14 EA 8" gate valve and box, bury as shown, (including lead); 1,459 LF 8" sanitary sewer pipe, 0-10 foot depth, (including air testing, mandrel testing, bedding and backfill), complete in place. See attached files.
AvailableHarris-Waller Counties Mud 4
The work consist of approx 1,060 LF 7/C #14 AWG standard cable; 90 LF #8 AWG bare copper (solid) wire; 30 LF 3" rigid metal conduit; 505 LF video image and radar com cable (coax); 2 EA 15' luminaire arm with LED luminaire fixture with shorting cap.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Harris-Waller Counties Mud 4
Close: Jan 8, 2026
The work consist of approx 1,060 LF 7/C #14 AWG standard cable; 90 LF #8 AWG bare copper (solid) wire; 30 LF 3" rigid metal conduit; 505 LF video image and radar com cable (coax); 2 EA 15' luminaire arm with LED luminaire fixture with shorting cap.
Harris-Waller Counties Mud 4
Work includes 118 LF, 24-IN RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place; 5 EA, Type "C" manhole for 24"-96" pipe, standard depth, complete in place; 240 SY, 5-inch (5") thick reinforced concrete slope paving, including weep holes, rebar and expansion joints; 798 LF, 60-IN RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place; 1,896 LF, fesilt and reshape roadside ditch; 1,125 CY, excavation of roadway to final elevations and grades; 2,721 Sy, mill 2" existing asphalt and dispose of offsite in a suitable manner; 1,663 GAl, Prime coat (@ 0.35 Gal/SY), complete in place. See outside link.
Posted Date
Sep 5, 2025
Due Date
Sep 19, 2025
Release: Sep 5, 2025
Harris-Waller Counties Mud 4
Close: Sep 19, 2025
Work includes 118 LF, 24-IN RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place; 5 EA, Type "C" manhole for 24"-96" pipe, standard depth, complete in place; 240 SY, 5-inch (5") thick reinforced concrete slope paving, including weep holes, rebar and expansion joints; 798 LF, 60-IN RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place; 1,896 LF, fesilt and reshape roadside ditch; 1,125 CY, excavation of roadway to final elevations and grades; 2,721 Sy, mill 2" existing asphalt and dispose of offsite in a suitable manner; 1,663 GAl, Prime coat (@ 0.35 Gal/SY), complete in place. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Harris-Waller Counties MUD No. 4's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database