Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
U.S. Army Engineer District ST Louis
The U.S. Army Corps of Engineers, St. Louis District, is seeking vendors to fabricate a durable, high-fidelity, modular 3D-printed physical model of the Lock and Dam 25 New 1200-ft Lock Project. The contractor must deliver a portable, to-scale model that can be disassembled for transport in Pelican-style cases, including a 15-barge tow model based on government-provided CADD/BIM files. This market research notice anticipates a 60-day period of performance with fabrication expected to begin around June 2026.
Posted Date
Feb 19, 2026
Due Date
Mar 13, 2026
Release: Feb 19, 2026
U.S. Army Engineer District ST Louis
Close: Mar 13, 2026
The U.S. Army Corps of Engineers, St. Louis District, is seeking vendors to fabricate a durable, high-fidelity, modular 3D-printed physical model of the Lock and Dam 25 New 1200-ft Lock Project. The contractor must deliver a portable, to-scale model that can be disassembled for transport in Pelican-style cases, including a 15-barge tow model based on government-provided CADD/BIM files. This market research notice anticipates a 60-day period of performance with fabrication expected to begin around June 2026.
AvailableU.S. Army Engineer District ST Louis
The U.S. Army Corps of Engineers, Louisville District intends to issue RFP W912QR26RA036 for the design-bid-build construction of a microgrid and combined heat and power (CHP) system at Lake City Army Ammunition Plant. The project installs two 7.5 MW dual-fuel CHP combustion turbines (15 MW total) with HRSGs, duct firing, a black start diesel generator, electrical distribution, controls, piping, HVAC and associated site work; the contract is firm-fixed-price with NAICS 237130 and an estimated magnitude of $25M-$100M. The solicitation is anticipated to be released on or about 2026-03-10 and the response deadline listed is 2026-03-10T13:00:00 EDT (2026-03-10T17:00:00Z).
Posted Date
Feb 19, 2026
Due Date
Mar 10, 2026
Release: Feb 19, 2026
U.S. Army Engineer District ST Louis
Close: Mar 10, 2026
The U.S. Army Corps of Engineers, Louisville District intends to issue RFP W912QR26RA036 for the design-bid-build construction of a microgrid and combined heat and power (CHP) system at Lake City Army Ammunition Plant. The project installs two 7.5 MW dual-fuel CHP combustion turbines (15 MW total) with HRSGs, duct firing, a black start diesel generator, electrical distribution, controls, piping, HVAC and associated site work; the contract is firm-fixed-price with NAICS 237130 and an estimated magnitude of $25M-$100M. The solicitation is anticipated to be released on or about 2026-03-10 and the response deadline listed is 2026-03-10T13:00:00 EDT (2026-03-10T17:00:00Z).
U.S. Army Engineer District ST Louis
This notice is a Sources Sought issued by MICC Fort Leonard Wood to conduct market research for cable television and high-speed internet services at Fort Leonard Wood, Missouri. The government may procure the requirement competitively and potentially award one Blanket Purchase Agreement (BPA), and the notice indicates small-business set-aside consideration. Responses (capabilities statements) are due by 2026-03-04 and the draft Statement of Work is attached to the posting for review.
Posted Date
Feb 18, 2026
Due Date
Mar 4, 2026
Release: Feb 18, 2026
U.S. Army Engineer District ST Louis
Close: Mar 4, 2026
This notice is a Sources Sought issued by MICC Fort Leonard Wood to conduct market research for cable television and high-speed internet services at Fort Leonard Wood, Missouri. The government may procure the requirement competitively and potentially award one Blanket Purchase Agreement (BPA), and the notice indicates small-business set-aside consideration. Responses (capabilities statements) are due by 2026-03-04 and the draft Statement of Work is attached to the posting for review.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Department of the Army, U.S. Army Corps of Engineers, USACE District St. Louis's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database