Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Chisholm-Hibbing Airport Authority
The project will consist of removal and replacement of approximately 16,220 feet of perimeter fence on the North, South, West, and East edges of the airfield. A wildlife deterrent skirt will be installed on the entirety of the new fence. Helical piers will be placed in wetland areas. Four (4) gates will be replaced and one (1) existing slide gate located within the work area will remain in place. The fence and gates will be installed in the same location as the original fence and the work areas will be restored to their original condition after fence installation. A berm will be constructed in two select areas as indicated in the project plans. Drainage culverts will be placed under the berm locations. The work will be completed in one phase of work.
Posted Date
May 6, 2026
Due Date
Jun 11, 2026
Release: May 6, 2026
Chisholm-Hibbing Airport Authority
Close: Jun 11, 2026
The project will consist of removal and replacement of approximately 16,220 feet of perimeter fence on the North, South, West, and East edges of the airfield. A wildlife deterrent skirt will be installed on the entirety of the new fence. Helical piers will be placed in wetland areas. Four (4) gates will be replaced and one (1) existing slide gate located within the work area will remain in place. The fence and gates will be installed in the same location as the original fence and the work areas will be restored to their original condition after fence installation. A berm will be constructed in two select areas as indicated in the project plans. Drainage culverts will be placed under the berm locations. The work will be completed in one phase of work.
AvailableChisholm-Hibbing Airport Authority
Ground up DNR Administrative Facility building envelope. Concrete and steel building structure. Full and partial height Interior partitions Interior finishes on all surfaces throughout: floors, ceilings, walls, etc. Office and café related casework. Full mechanical system and associated equipment. Full electrical panel and power system, lighting, and associated equipment. Full plumbing lines, fixtures and associated equipment.
Posted Date
Jul 19, 2025
Due Date
Sep 8, 2025
Release: Jul 19, 2025
Chisholm-Hibbing Airport Authority
Close: Sep 8, 2025
Ground up DNR Administrative Facility building envelope. Concrete and steel building structure. Full and partial height Interior partitions Interior finishes on all surfaces throughout: floors, ceilings, walls, etc. Office and café related casework. Full mechanical system and associated equipment. Full electrical panel and power system, lighting, and associated equipment. Full plumbing lines, fixtures and associated equipment.
Chisholm-Hibbing Airport Authority
The project scope consists of the following construction elements: Bituminous Milling; Bituminous Paving; Drainage Replacement; Erosion Control / Restoration
Posted Date
Jun 4, 2025
Due Date
Jul 2, 2025
Release: Jun 4, 2025
Chisholm-Hibbing Airport Authority
Close: Jul 2, 2025
The project scope consists of the following construction elements: Bituminous Milling; Bituminous Paving; Drainage Replacement; Erosion Control / Restoration
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge